Avery 256 用户手册

下载
页码 58
6
C
ONTENTS
1.2 S
AFETY
 
INSTRUCTIONS
ALS
20x 
256
GB
1.2.3
Before beginning production
Due diligence of the operating company 
and the service technician
£
Ensure that the following prerequisites are fulfilled in 
accordance with the service instructions:
– The machine is installed properly and configured in 
accordance with the guidelines.
– All required safety mechanisms have been installed.
– The unit has performed at least one successful test 
run.
– The unit is connected to the power supply.
£
The users have the required personal protective 
equipment, for example, a hairnet. Ensure that the 
protective equipment is utilised correctly.
Due diligence of the user
£
Check that the safety installations are working 
properly.
£
Inspect the machinery for any visible damage. 
Report any ascertained defects immediately.
£
Use the required personal protective equipment 
correctly, for example, wear a hairnet.
£
Remove any unnecessary materials and objects 
from the operating area of the unit.
£
Ensure that only authorised persons are within the 
operating range of the machine.
£
Ensure that starting up the machine will not injure 
anyone.