Renesas SH7700 Series 用户手册

下载
页码 43
 
 
28 
2.2.7 
Note on Setting the UBC_MODE Command 
In the [Configuration] dialog box, if [User] is set while the [UBC mode] list box has been set, the 
STEP-type commands that use Break Condition 2 for implementation cannot be used.   
2.2.8 Performance 
Measurement 
Function 
The SH7710 E10A emulator supports the performance measurement function. 
1.  Setting the performance measurement conditions 
To set the performance measurement conditions, use the [Performance Analysis] dialog box 
and the PERFORMANCE_SET command.  When any line on the [Performance Analysis] 
window is clicked with the right mouse button, the popup menu is displayed and the 
[Performance Analysis] dialog box is displayed by selecting [Setting]. 
 
Note:  For the command line syntax, refer to the online help. 
(a) Specifying the measurement start/end conditions 
The measurement start/end conditions are specified in the [Mode] drop-down list box in the 
[Performance Analysis] dialog box.  Three conditions can be set as shown in table 2.9. 
 
Table 2.9   Conditions Specified in [Mode] 
Item Description 
Normal break 
Measurement is started by executing a program and ended when a 
break condition is satisfied. 
Break Condition 1 -> 2 
Measurement is started from the satisfaction of the condition set in 
Break Condition 1 and ended with the satisfaction of the condition set in 
Break Condition 2. 
Break Condition 2 -> 1 
Measurement is started from the satisfaction of the condition set in 
Break Condition 2 and ended with the satisfaction of the condition set in 
Break Condition 1.