Husqvarna 968999699 用户手册

下载
页码 85
English
-
36
OPERATION
Manual Transport
When pushing or pulling the mower, be sure to engage 
the IZT (Integrated Zeroturn Transaxle) bypass 
linkages. The IZT bypass linkages are located on the 
rear of the frame, below the rear engine guard.
Always turn off engine before engaging 
or disengaging the hydro release. Never 
attempt to adjust the bypass linkages with 
the engine running.
Raise the deck into the highest cutting 
position.
Pull the IZT bypass linkages out and into 
the slots and release so that it is held in the 
bypass position.
To reengage the IZT’s to drive, reverse the 
above procedure.
WARNING!
No adjustments or maintenance 
to be carried out unless:
the engine stopped
the ignition key removed
the parking brake activated
1. IZT Bypass linkage
Bypass linkages
CZ10-2
1. Head outside of rear deck
1. IZT Bypass linkage
Bypass linkages
CZ12
English
-
36
1
2