MRV Communications TS700/G 用户手册

下载
页码 77
M R V   C o m m u n i c a t i o n s ,   I n c .   –   I n s t a l l a t i o n   M a n u a l  
30 
2.  
Received power 
 
100   <   OPTICAL POWER   <   1000 
Expected Results 
The BER must be less than 10E-12 (10
-12
) for on-going tests and error-free for 
short tests. 
2. TS700/100
 
Proper Display 
 
2.  
Indicators 
 
Indicator 
AIR RX
 100baseT
 
Position 
Flag TX Flag TX 
Alignment
 Loopback
 
ON
x
 
x
 
x
 
x
 
 
 
OFF
 
 
 
 
x
 
x
 
Table 8: Indicators
 
 
3.  
Received power 
 
100   <   OPTICAL POWER   <   1000 
Expected Results 
The BER must be less than 10E-12 (10
-12
) for on-going tests and error-free for 
short tests. 
The PING test and file transfer procedure should not post any TIME OUT alarm 
or last too long time so long as the cabling connection is OK. 
 
3. TS700/G
 
Proper Display 
 
3.  
Indicators 
 
Indicator 
AIR RX
 Electrical
 
Position 
Flag Laser 
Enabled 
Flag 
ON
x
 
x
 
x
 
OFF
 
 
 
Table 8: Indicators
 
 
4.  
Received power 
 
100   <   OPTICAL POWER   <   1000 
Expected Results 
The BER must be less than 10E-12 (10
-12
) for on-going tests and error-free for 
short tests. 
The PING test and file transfer procedure should not post any TIME OUT alarm 
or last too long time so long as the cabling connection is OK.