Installing Powerline MU 
 
WARNING!
 
A qualified electrician is required to connect the Powerline MU Gateway to the electrical 
panels in the building. 
 
 
NOTE: 
Every effort has been made to use diagrams, symbols, wiring colors and 
labels  that are accepted universally across all countries.  In cases where that is 
impossible,  North American references are used in this documentation
 
The following steps will guide you with your installation: 
1.  Gather information 
You will need to gather information about the electrical system in the building in order to 
design your network.  
 
Locate all distribution points and electrical panels on the electrical 
diagram. These areas provide optimal locations for Gateway placement. 
 
Locate any electricity (power) meters or electricity (power) meter banks. 
 
Identify which areas of the building are powered by each panel. 
 
Identify all electrical closets and risers. 
 
Determine potential connectivity from the panel locations to the main 
Internet access point, including telephone cable and conduit access. 
2.  Find or create an electrical diagram of the building. 
Electrical diagrams, which provide details of the building’s electrical layout, are typically 
available from the property manager or electrician  Perform a site survey to know where 
all the power panels are located and determine how you will connect the gateways to the 
Internet access point.  Be sure you know who has to be involved from an electrical 
connectivity standpoint; utility, building owner, etc. 
It is a requirement of the standard for electrical installations in buildings that a diagram 
chart or schedule is provided, giving details of the installation. Thus such a diagram 
should be available, and if any modifications are made when installing the Powerline MU, 
they must be recorded. 
If no electrical diagram is available, however, create one. The following symbols are often 
used to denote various electrical devices and connections. Symbols may differ according 
to the country of local code where the Powerline MU is being installed. For example, 
“Ground” is called “Earth” in some countries. The symbols used in various countries can 
be found on the International Electrotechnical Commission (IEC) website (www.iec.ch).