Verizon Network Manager Nodes 用户手册

下载
页码 69
7-2
Version 1.08
January 15, 2008
Implementation Details
Figure 7-2:   Implementation Details
4. Select Activate Trigger Points in the Trigger Point section to activate trigger points when the 
plan is implemented. This option is only available if Trigger Points are in the plan.
5. De-select the As soon as possible option and select the date and time you want from the 
Effective Date and Time field if you want the plan to implement in the future.
6. Select the Rollback option and date and time for the rollback from the Rollback Date and 
Time section if you want to return to the current “plan in use.”
7. Click Submit. The Results of the IMPL request dialog appears (next page).