ATTO Technology 2390C/R/D 用户指南

下载
页码 51
6
Manual reset switch
A manual reset switch reboots the FibreBridge.
To reset the FibreBridge, depress the reset button 
for no more than three seconds. 
To restore factory defaults, press the reset button 
for more than four seconds until the green Ready 
LED blinks.
LED indicators
The LED indicators can be viewed from the connector 
(back) side and the front side of the FibreBridge 
2390R/D. (See Exhibit 1.2-1)
LEDs on the connector (back) side are:
A bicolor Ready/Fault LED 
lights green to indicate 
ready, lights yellow to show a faulted condition, and is 
off to indicate not ready.
Embedded in the Ethernet port connector: 
lighted green LED shows a valid link; off indicates 
that no link is present. A separate blinking yellow LED 
indicates activity.
Fibre Channel port:  
A lighted green LED indicates 
link; off means no link. A separate green LED 
indicates activity if it is lit, no activity if it is off. 
SCSI ports:  
A green LED on each port indicates 
activity if is lit.
LEDs on the front panel are:
A bicolor Ready/Fault LED 
is lighted green to 
indicate ready, lighted yellow to show a faulted 
condition, and off indicates not ready.
SCSI ports:  
A green LED on each port indicates 
activity if is lit.
Fibre Channel port:  
bicolor LED indicates FC 
speed. If it is off, speed is 1-Gb; if it is green, 2-Gb, 
and yellow indicates 4-Gb FC. A separate green LED 
indicates activity if it is lit, no activity if it is off. 
Exhibit 1.2-1  Fibre Bridge 2390R/D dimensions with front panel LEDs and connector side details
S erial port
R eady, Fault LE D s
Ethernet port
Fibre C hannel port
FC  A ctivity, Link LE D s
S C SI ports
Pow er receptacle
SC S I  A ctivity  LED s
R eset sw itch