ZyXEL Communications NSA-2401 用户手册

下载
页码 362
 Chapter 11 Maintenance Screens
NSA-2401 User’s Guide
245
The following table describes the labels in this screen.   
11.7  Shutdown 
Click Maintenance > Shutdown to open the shutdown screen. Use this screen to turn off the 
NSA or  restart it. Before shutting down or restarting, check the System Status screen to make 
sure that no one is logged into the NSA or transferring files to or from it.
Table 107   Maintenance > Power Management > Edit
LABEL
DESCRIPTION
Power Control Schedule 
List
This table lists the power on, power off, and reboot schedules. For 
example, you could have one schedule to turn the NSA on every morning, 
at 8:00, another schedule to turn it off every evening at 18:00, and a third 
schedule to have it reboot every Friday at 14:00. Click a column’s heading 
cell to sort the schedules by that column’s criteria. Click the heading cell 
again to reverse the sort order.
Type
This field displays whether the power control schedule has the NSA turn 
on, turn off, or reboot.
Frequency
This field shows how often (monthly, weekly, or daily) the NSA is to apply 
this power control schedule. 
Execute Time
This field shows when the NSA is to use this power control schedule 
(when the NSA is to turn on, turn off, or reboot).
Delete
Click this to remove a power control schedule from the list. 
Add Power Control 
Schedule
Use this part of the screen to configure power on, power off, and reboot 
times.
Type
Select whether this power control schedule has the NSA turn on, turn off, 
or reboot.
Frequency
Select whether the NSA is to apply this power control schedule entry on a 
monthly, weekly, or daily basis. 
Execute Time
Enter the time, day, and/or day of the month as appropriate for this power 
control schedule entry. Leave more than 10 minutes between the 
execution times of the entries.
If the NSA turns off or restarts while a user is transferring files to or from 
the NSA, the transfer fails. The user will need to restart the transfer.
The NSA skips a scheduled restart or power off if the execution time 
comes while the NSA is doing any of the following:
Resynchronizing a RAID
Upgrading firmware
Replacing the configuration file
The NSA delays a scheduled restart or power off until it finishes any of the 
following:
Backing up files 
Restoring files from a backup 
Taking a snapshot
If the NSA is turned off at the time when a restart or power off is 
scheduled, the NSA does not perform the restart or power off.
If the NSA is turned on at the time when a power on is scheduled, the 
NSA does not perform the power on.
Add
Click this to add the power control schedule to the list.
Apply
Click this to save your changes.
Cancel
Click this to discard changes and close the window.