GE 300 用户手册

下载
页码 38
 
GE
 
OPM_SGS_ISG_M22_M30_0US_V011.doc 
13/38 Installation 
Guide 
SG Series 225 & 300 kVA 
Openings for input and output cable connections 
SG
S_2
25-
300
_UP
S v
iew
 top
_01
US
1,650mm
64.96"
160mm
6.30"
2.7
6"
40mm
1.58"
70m
m
31.
50"
21.
66"
550
mm
800
mm
Utility input
Output Load
Battery
Fig. 3.4.1-2   Opening on top of the cabinet for input and output cables 
Utility input
Output Load
6.30"
160mm
1.77"
550
mm
21.
66"
800
mm
31.
50"
100
mm
3.9
4"
1,650mm
64.96"
SG
S_2
25-
300
_UP
S v
iew
 bo
ttom
_02
US
45mm
Fig. 3.4.1-3   Opening on the bottom of the cabinet for input and output cables 
SG Series openings are 
provided on the top and 
the bottom of the UPS 
for the connection of 
input and output cables. 
 
Pay attention to the 
position of these 
openings, when 
choosing the placement 
of the UPS. 
These openings are 
covered with a 
protective plate.
 
 
 
Fixing of the UPS cabinet on the floor 
The UPS cabinet is free standing and normally does not require to be bolted to the floor. 
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the 
floor. 
See Fig. 3.4.1-4.
 
62.205"
1580mm
35mm
71
3m
m
28
.0
71
"
60
m
m
2
.363
"
60mm
2.363"
68
0m
m
26.772"
1.378"
1.378"
35mm
=
=
SGS_225-300_UPS view bottom_02US
Ø 0.47305"
Ø 12mm
Front side
 
Fig. 3.4.1-4   Fixing of the UPS cabinet on the floor