Cabletron Systems STS16-20D 用户手册

下载
页码 258
73
Accessing Switch Management
SmartStack STS16-20D/STS16-20R Token Ring Switches Installation and User Guide
5. If you still can not get the connection to work, contact a support person.
Diagnostic Screen
The diagnostic self-test displays two different screens, depending on whether you 
perform a cold boot (power-o n cycle with full diagnostics), or a warm boot (a reset 
without full diagnostics). The warm boot contains portions of the complete cold 
boot list.
The following is an example of a diagnostic screen during a boot process. The 
actual screen may vary depending on, for example, hardware, options, and software 
version levels:
BootStrap Firmware v2.3, Copyright 1996-1998 
- Initiating bootstrapping sequence.
- Boot image integrity check...Passed.
- Control transferred to boot process.
Boot Firmware (Phase II) v2.3
- Program memory test........Passed.
- Relocating main image to 
DRAM.......................................Done.
- Main image integrity check...succeeded.
- Control transferred to main process.
- Starting Power On Self Test Diagnostics.
  - Network memory test 32-bits........Passed.
  - Network memory test 16-bits........Passed.
  - Network memory test 8-bits........Passed.
  - Port register and memory test.....................Passed.
  - Single port loopback test.....................Passed.
  - All ports linked loopback test.....................Passed.
  - Port MAC test.....Passed.
- Completed Power On Self Test Diagnostics.
System Software Version 4.0.0, Copyright 1994-1999.
System started on Mon. June 21, 1999 14:30:03
8 Megabytes System memory
2 Megabytes Network memory
- Initialization started
- File system initialized
- System temperature is within safe operating levels
- Checking file system integrity
- Warmboot initialization started
- LAN ports detected: 
  - RJ-45 Token Ring: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
  - StkPort   : 29 
- Initializing Ports: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19