Lantronix 900-510 用户手册

下载
页码 280
3: Installation 
SLB™ Branch Office Manager User Guide 
 
24 
Relative Humidity 
Operating: 10% to 90% non-condensing 
Storage: 10% to 90% non-condensing 
Heat Flow Rate 
68 BTU per hour 
Current measurement 
accuracy 
± 12% 
1
 The max input/output current is de-rated to 12A when using the supplied NEMA 
5-15P (15A) cable (p/n SLPP012310-01).   
The max input/output current is de-rated to 16A when using the optional NEMA 
5-20P (20A) cable (p/n SLPP012410-01, SLPP012510-01, SLPP012610-01). 
Physical Installation 
To install the SLB branch office manager in a rack: 
1.  Place the SLB device in a 19-inch rack. 
Warning: 
Be careful not to block the air vents on the sides of the SLB 
branch office manager. If you mount the SLB in an enclosed rack, we 
recommended that the rack have a ventilation fan to provide adequate 
airflow through the SLB. 
2.  Connect the serial device(s) to the SLB device ports. See
 
on page 
. 
3.  Install any PC Cards you intend to use. If you install a modem card, connect to the 
phone line. See
. 
4.  You have the following options: 
a)  To configure the SLB branch office manager using the network, or to monitor 
serial devices on the network, connect at least one SLB network port to a 
network. See 
on page 
 
b)  To configure the SLB branch office manager using a dumb terminal or a 
computer with terminal emulation, connect the terminal or PC to the SLB 
console port. Se
 on page 
. 
5.  Connect the power cord, and apply power. Se
 on 
page 
 
6.  Wait approximately a minute and a half for the boot process to complete. 
When the boot process ends, the SLB host name and the clock appear on the LCD 
display.  
Now you are ready to configure the network settings as described i