Kingston Technology KNE16WG 用户手册

下载
页码 32
6 Hardware 
Installation 
Kingston Technology Company 
EtheRx User’s Guide - Rev. B00 
Hardware Installation 
Before you begin installing network cables, please take a few moments to 
familiarize yourself with the EtheRx hubs.  The front and rear panels of the 
Stackable hubs are used for illustration.  
Note:  WorkGroup hubs have identical features except for the Stacking Ports. 
Front Panel 
LINK / ACTIVITY / PARTITION
Stackable Hub
KNE8TP/SE
PWR
CASCADE
1
2
3
4
5
6
7
8
BNC
UTIL %
COLL %
STACK IN STACK OUT
Stacking
Ports
Utilization LEDs
Collision LEDs
BNC Port LED
UTP Port LEDs
Cascade
Switch
Power LED
 
Fig. 1-1  KNE8TP/SE Front Panel 
PWR
Stackable Hub
KNE16TP/SE
CASCADE
UTIL %
COLL %
STACK IN STACK OUT
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
LINK / ACTIVITY / PARTITION
AUI
BNC
ACTIVITY / PARTITION
Stacking
Ports
Utilization LEDs
Collision LEDs
BNC Port LED
UTP Port LEDs
Cascade
Switch
Power LED
AUI Port LED
 
Fig. 1-2  KNE16TP/SE Front Panel 
Power LED 
The green LED indicates the power status. The LED will light when the AC 
power transformer is connected from a power source to the hub. 
Stacking Ports (SE models only) 
The Stackable hub models (KNE8TP/SE and KNE16TP/SE) include a  
“Stack-In” and “Stack-Out” port for stacking up to five (5) SE hubs in any 
combination of 8-Port and 16-Port models. Refer to the section, “Stacking 
EtheRx SE Hubs” 
on page 13 for additional information.