Kingston Technology KNE8SE 用户手册
6 Hardware
Installation
Kingston Technology Company
EtheRx User’s Guide - Rev. B00
Hardware Installation
Before you begin installing network cables, please take a few moments to
familiarize yourself with the EtheRx hubs. The front and rear panels of the
Stackable hubs are used for illustration.
familiarize yourself with the EtheRx hubs. The front and rear panels of the
Stackable hubs are used for illustration.
Note: WorkGroup hubs have identical features except for the Stacking Ports.
Front Panel
LINK / ACTIVITY / PARTITION
Stackable Hub
KNE8TP/SE
PWR
CASCADE
1
2
3
4
5
6
7
8
BNC
UTIL %
COLL %
STACK IN STACK OUT
Stacking
Ports
Ports
Utilization LEDs
Collision LEDs
BNC Port LED
UTP Port LEDs
Cascade
Switch
Power LED
Fig. 1-1 KNE8TP/SE Front Panel
PWR
Stackable Hub
KNE16TP/SE
CASCADE
UTIL %
COLL %
STACK IN STACK OUT
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
LINK / ACTIVITY / PARTITION
AUI
BNC
ACTIVITY / PARTITION
Stacking
Ports
Ports
Utilization LEDs
Collision LEDs
BNC Port LED
UTP Port LEDs
Cascade
Switch
Power LED
AUI Port LED
Fig. 1-2 KNE16TP/SE Front Panel
Power LED
The green LED indicates the power status. The LED will light when the AC
power transformer is connected from a power source to the hub.
power transformer is connected from a power source to the hub.
Stacking Ports (SE models only)
The Stackable hub models (KNE8TP/SE and KNE16TP/SE) include a
“Stack-In” and “Stack-Out” port for stacking up to five (5) SE hubs in any
combination of 8-Port and 16-Port models. Refer to the section, “Stacking
EtheRx SE Hubs” on page 13 for additional information.
“Stack-In” and “Stack-Out” port for stacking up to five (5) SE hubs in any
combination of 8-Port and 16-Port models. Refer to the section, “Stacking
EtheRx SE Hubs” on page 13 for additional information.