Emerson 7000 SERIES 7ADTB 用户手册

下载
页码 12
INSTALLATION
(continued)
1---2
De–energize the conductors before making any
line or auxiliary circuitry connections. Be sure
that Normal and Emergency line connections
are in proper phase rotation. Place engine gen-
erator starting control in the OFF position. Make
sure engine generator is not in operation.
Testing Power Conductors
Do not connect the power conductors to the ADTB until
they are tested. Installing power cables in conduit, cable
troughs, and ceiling-suspended hangers often requires
considerable force. The pulling of cables can damage
insulation and stretch or break the conductor’s strands.
For this reason, after the cables are pulled into position,
and before they are connected they should be tested to
verify that they are not defective or have been damaged
during installation.
Protect the switch from construction grit
and metal chips to prevent malfunction or
shortened life of the ADTB switch.
Connecting Power Conductors
Wiring Diagram is furnished with the ADTB. All wiring
must be made in accordance with the local codes. After
the power cables have been tested, connect them to the
appropriate terminal lugs on the Bypass Switch as shown
on the wiring diagram provided with this ADTB. Make
sure that the lugs provided are suitable for use with the
cables being installed.
Standard terminal lugs are
solderless screw type and will accept the wire sizes listed
on the drawings provided with the ADTB. Be careful
when stripping insulation from conductors; avoid nicking
or ringing the conductor. Remove surface oxides from
conductors by cleaning with a wire brush.
Follow
conductor manufacturer’s instructions when aluminum
conductor is used. Apply joint compound to conductor,
then carefully wipe away excess compound. Tighten the
cable lugs to the torque specified on the rating label.
Be sure that the Normal and Emergency power
connections are in proper phase rotation.
Bus Connections
If bus connection is used, use SAE grade 5 hardware to
connect bus to appropriate terminal plates on bypass
switching device. Wipe off bus surfaces before they are
joined. If bus is dirty, gently clean surfaces with a
non-flammable solvent. Avoid touching cleaned surfaces.
Do not breathe cleaning solvent vapors.
Use SAE grade 5 hardware and tighten the bolted joints
to the torque specified in Table A.
The reliability of the connection depends
on how clean and how tight the joint is.
Table A.
Tightening torque values for bolted joints.
Bolt Diameter
(Grade 5 hardware)
in inches
Recommended
Tightening Torque
in foot pounds
5/16
12
3/8
20
1/2
50
5/8
95
Harnesses
All internal connections are made at the factory. The
bypass switch, transfer switch, and control panel are
joined together by an interconnecting wire harness. The
disconnect plugs are already engaged on enclosed
switches. For opentype switches, the plugs must be
engaged after installation is completed. Align harness
plugs with sockets in the control and push them together
until they are secure.
Engine Starting Contacts
and Auxiliary Circuits
The engine control contact signal connections and
auxiliary circuits are located on terminal block TB as
shown on the Wiring Diagram provided with the ADTB.
Connect the signal wires to the appropriate terminals.