Siemens 411 用户手册

下载
页码 164
Issue 03/01 
3  Commissioning 
MICROMASTER 411 & COMBIMASTER 411    Operating Instructions 
 
6SE6400-5CA00-0BP0 
49
 
3.3.3 Default 
setup 
To change parameters it is necessary to use a Basic Operator Panel (BOP), 
Advanced Operator Panel (AOP) or an external serial interface with DriveMonitor 
or STARTER. The inverter is therefore delivered with the following default settings: 
 
Setpoint control from the Analog input in addition to Control Potentiometer. 
 
Supply frequency set for 0 to 50 Hz. 
 
Digital inputs: 
DIN 1 ON/OFF1. 
DIN 2 Reverse. 
DIN 3 Fault Acknowledge 
 
Jumpers for Ramp and Control circuits set to open (default settings). Refer to 
sections 3.3.1 and 3.3.2. 
 
Relay – Fault conditions. 
 
3.3.4 Commissioning 
Overview with BOP or AOP 
Prerequisites 
Mechanical and electrical Installation is completed. 
 
NOTE 
We recommend the commissioning according this scheme. 
 
 
Setting the motor frequency 
Jumper 60Hz: OFF = 50 Hz / ON = 60 Hz 
Quick Commissioning P0010 = 1 
See Section 3.3.4.3 
Further Commissioning via P0004 and P0003 
An overview of the parameter structure is given in 
Section 5.3 
For a detailed description of parameters, see the 
Parameter List. 
Power ON