Siemens CP 343-1 用户手册

下载
页码 22
english
12
Product information CP 343–1 
C79000–Z8964–C038–05
2.2
Procedure
Steps in Installation
Installing the CP 343-1 involves the following steps.
S
Plug in the CP 343-1 and secure it with the screws (make sure that the
bus connector between the CPU/IM and CP 343-1 is present).
S
Attach the CP 343-1 to Industrial Ethernet as illustrated in Section 2.3.
S
Connect a 24 V power supply.
Note
Make sure that you use the same voltage source as for the CPU or
IM 361.
Note
The two front panels must be kept closed during operation. The module
must be installed so that its upper and lower ventilation slits are not
covered, allowing adequate ventilation.
Configuration
To initialize the CP 343-1 for communication services, use the configuration
tool NCM S7 for Industrial Ethernet.
PG/PC Connection
You can connect the programming device when configuring the CP as
follows:
S
via MPI
S
via Industrial Ethernet
If you configure the module via Industrial Ethernet, the CP 343-1 must
already have a MAC address, in other words the hardware configura-
tion of the CP 343-1 must already have been downloaded via the MPI
interface (for details of node initialization, see /8/).