HP (Hewlett-Packard) 2610 用户手册

下载
页码 112
2-6
Installing the Switch
Installation Procedures
In
sta
llin
g
 th
e
 Sw
itc
h
1. Prepare the Installation Site
Cabling Infrastructure
 - Ensure the cabling infrastructure meets the 
necessary network specifications. See the following table for cable types and 
lengths, and see appendix B, 
 for more 
information:
Installation Location
 - Before installing the switch, plan its location and 
orientation relative to other devices and equipment:
In the front of the switch, leave at least 7.6 cm (3 inches) of space for 
the twisted-pair and fiber-optic cabling.
In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space 
for the power cord.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it 
is working properly by plugging it into a power source and verifying it passes 
its self test.
1.
Connect the power cord supplied with the switch to the power connector 
on the back of the switch, and then into a properly grounded electrical 
outlet.
Figure 2-1. Connecting the power cord
Connect power cord to 
the power connector