Black Box ServSwitch CX 用户手册

下载
页码 114


®
Power switching configuration
Power switch configuration comprises two main steps:
•  Configure the 
POWER CONTROL
 serial port to the same speed as used by the 
•  Configure power ON and OFF strings for each relevant host server.
For each power port there needs to be a valid ‘Power ON string’ and similarly an 
appropriate ‘Power OFF string’. In each case, the strings are a short sequence of 
characters that combine a port address and a power on or off value. 
If a particular server has more than one power input (and thus requires an 
equivalent number of power ports to control them), collections of strings can be 
combined to switch all of the required ports together as a group.
To configure the power sequences for each host server
1  Using VNC viewer or a browser, log on as the ‘admin’ user.
2  Click the ‘Configure’ button in the top right corner.
3  Click the ‘Host configuration’ option.
4  Click a host entry to display a Host configuration dialog:
Power control sequences
Note: The settings given below are for the EPS-S8 power switch - other power 
switches may require different settings. Please refer to your power switch 
documentation for details about codes required by other power switches.
The structure of each power sequence (OFF and ON) is as follows:
Pxy=z\0D 
  Where: 
x is the switch box number,
y is the power port number,  
z is ‘0’ for OFF or ‘1’ for ON, and
\0D represents Enter (or Carriage return).
Example 1
 
To switch ON port 5 of switch box 2, the code would be as follows:
•  Power sequence:  
P25=1\0D
Example 2 
To switch OFF port 8 of switch box 3, the code would be as follows:
•  Power sequence:  
P38=0\0D
For details about operating this feature, see 
 within the  
Operation chapter.
To control two or more ports simultaneously
You can control up to four power ports using a single sequence. This is done 
using the same command structure as shown above, plus a delay command, 
for each port. Immediately following a port command, insert the characters 
‘\*’ before the next port command, and so on up to four ports. For instance, to 
switch on ports 1 and 2 in the first power switch, the command line would be:
 
P11=1\0D\*P12=1\0D
5  If necessary, configure other parameters (Name, Users, Hot Keys - 
).
6  Enter the 
Power control sequences in the Power On and Power Off fields 
7  Click OK to close the dialog and then click the Save button in the main Host 
Configuration window to store the details.