Meridian America 61 用户手册

下载
页码 867
59
Preparing for installation
The following items should be provided at the time of installation:
 Work orders
 Equipment room floor plan
Building cable plan
Installation, Administration and Maintenance Manuals, and User
Guides
Installation plan
Delivery equipment (pallet jack, for instance)
 instructions
Work orders
The Work order may include:
Terminal Number (TN) assignments
Directory Number 
 assignments
individual terminal, data unit feature assignments
terminals and user profiles
system and terminal cross-connect assignments
a detailed listing of the equipment ordered
administration database entries for features and services
The work order will vary depending on the distributor for a
specific system.
Installation planning 553-3001-120