Provisioning guidelines
Procedure 3-1
Provisioning guidelines
Note: To determine the equipment requirements, follow the
provisioning guidelines in the order shown below. Worksheets and
Tables are all provided at the end of this document.
Step 
1
Define and forecast growth.
Step 2
Estimate ccs per terminal.
Step 3
Calculate number of trunks required.
Step 4
Calculate line, trunk, and console load.
Step 
Calculate 
 requirements.
Step 6
Calculate total system load.
Step 7
Calculate number of superloops required.
Step 8
Calculate number of Network groups required.
Step 9
Calculate number of PE cards required.