Fujitsu BX400 S1 用户手册

下载
页码 130
BX400 S1
Operating Manual
43
Installing the hardware
– You must ensure that the safety mechanisms on the server, e.g. stoppers or 
retaining systems, are functioning correctly.
– The shape of the rack support uprights must ensure that the support 
systems can be bolted to the front.
The support systems have a linear alignment feature to ensure that they can 
be adjusted to different rack depths.
– No cable management support (delivered with the mounting kit).
– Climatic conditions:An unobstructed air intake in the rack front and air 
discharge in the rear cover of the rack are essential for ventilation of the 
installed server.
In general, the ventilation concept ensures that the necessary cooling is 
achieved by the horizontal self-ventilation of the installed devices (air flow 
from the front to the rear). 
– Power supply:For installation in 3rd party racks, you must ensure that the 
appropriate socket strips are present.
4.4.2
Installation in the rack
For installation in a PRIMECENTER/DataCenter rack, the following parts are 
required:
– Two 3-HU Support brackets (for the EMEA market)
– Two carrier rails (mounted)
– Two holding-down clamps
I
General information regarding server installation in the rack is included 
in the technical manual for the appropriate rack.
When mounting the left carrier rail in the PRIMECENTER/DataCenter rack, the 
supplied support bracket must first be mounted on the rear left support upright 
flush with the bottom edge of the device. 
Ê
Read the installation guide in the technical manual for the corresponding 
rack.
Ê
Mark the position of the bottom edge of the system unit on the support 
uprights.