ZyXEL Communications nsa325 业主指南

下载
页码 576
 Chapter 18 Maintenance Screens
Media Server User’s Guide
323
18.4  The Log Screen 
Click Maintenance > Log to open the following screen.
Execute Time 
(hh:mm)
Enter the time, day, and/or day of the month as appropriate for this power control 
schedule entry. Leave more than 10 minutes between the execution times of the entries.
If the NSA turns off or restarts while a user is transferring files to or from the NSA, the 
transfer fails. The user will need to restart the transfer.
The NSA skips a scheduled restart or power off if the execution time comes while the NSA 
is doing any of the following:
Resynchronizing a RAID
Upgrading firmware
Replacing the configuration file
If the NSA is turned off at the time when a restart or power off is scheduled, the NSA does 
not perform the restart or power off.
If the NSA is turned on at the time when a power on is scheduled, the NSA does not 
perform the power on.
Use this part of the screen to configure power on, power off, and reboot times.
Please select the 
day of the month
This is only available if you set the Frequency to Monthly.
Choose the day of each month for the power control schedule entry.
Every how many 
weeks?
This is only available if you set the Frequency to Weekly.
Enter the interval between weeks and choose the day of the week for the power control 
schedule entry.
Every how many 
days?
This is only available if you set the Frequency to Daily.
Enter the interval between days for the power control schedule entry.
Add
Click this to add the power control schedule to the list.
Apply
Click this to save your changes.
Cancel
Click this to return to the previous screen without saving.
Table 112   Maintenance > Power Management > Edit (continued)
LABEL
DESCRIPTION