Husqvarna 4000 用户手册

下载
页码 17
6
EXCEL SERIES BLADES
The Excel Series of diamond blades have been designed specifically for the Soff-Cut Ultra Early Entry dry cutting system of 
green concrete. These specialty blades are designed to increase speed and life while cutting a wide range of aggregates. 
Choose the correct specification of diamond blade for your area as follows:
 
Purple Excel Series 1000   
XL14-1000 
Ultra hard aggregate and non abrasive sand
 
Green Excel Series 2000   
XL14-2000 
Hard to ultra hard aggregate and non abrasive sand
 
Red Excel Series 3000 
 
XL14-3000 
Hard aggregate, medium abrasive sand
 
Orange Excel Series 4000  
XL14-4000 
Medium hard aggregate, medium abrasive sand
 
Yellow Excel Series 5000   
XL14-5000 
Medium hard to soft aggregate, abrasive sand
 
Black Excel Series 6000   
XL14-6000 
Soft aggregate, highly abrasive sand 
Step 1
Turn the key switch (located on the engine) to the “ON” posi-
tion. Press the rocker switch located in the right handle bar to 
raise the saw to its full height. Turn the key to the “OFF” posi-
tion.
Step 2
Remove the blade block cover (A) by turning the two locking 
knobs counter-clockwise. Insert the blade wrench supplied 
with the saw on the blade shaft bolt (C) on the end of the blade 
shaft in the blade block (I). Rotate the blade shaft counter-
clockwise with wrench on the blade shaft bolt (C) while push-
ing in on the blade shaft locking pin (J) located on the front of 
the saw frame. The locking pin will drop in the blade shaft and 
prevent the shaft from rotating.
Step 3
Remove the blade shaft bolt by continuing to turn the bolt 
counter-clockwise. Remove the outer arbor washer or flange 
(D).
WARNING 
Inspect the blade (K) for any damage. Do not use any 
blade that has cracks, nicks, flaws or a damaged arbor. 
Make sure the blade is marked with a maximum operat-
ing speed greater than 3500 rpm.
Step 4
Match the blade tri-arbor to the blade shaft arbor (F) and install 
the blade firmly against the rear flange (F). Insure the blade is 
installed on the tri-arbor correctly. Match the female tri-arbor of 
the outer washer or flange with the blade shaft and install the 
blade shaft bolt turning clockwise while holding the locking pin 
in. Be sure the outer flange is fully seated and firmly holding 
the diamond blade in position.
Step 5
Install a new skid plate (G) by hooking the front on the front 
blade block shaft pin. Connect the rear blade block shaft and 
the rear of the skid plate by installing the locking pin (B). 
Step 6
Install the blade cover by turning the two knobs and tighten un-
til fully seated against the blade block. Lift the front and rear of 
the skid plate to insure the blade slides through the skid plate 
freely. 
Step 7
Insure the lexan shields (E & H) move freely up and down. 
When replacing a worn blade, thoroughly clean the concrete 
from blade block and blade cover before installing the new 
blade. Discard the old skid plate and replace it with a new skid 
plate.
NOTE:  
The patented skid plate is the most important part of the 
Soff-Cut Ultra Early Entry system. If it is bent, twisted or 
damaged, spalling and raveling of a cut may result. Store 
skid plates carefully and install them properly. Install a 
new skid plate with each new blade. Never re-use skid 
plates.
A
C
D
B
F
G
E
H
 
 
 
 
 
 
 
 
BLADE AND SKID PLATE INSTALLATION
I
 
J
 
K