Alamo 3109 用户手册

下载
页码 104
OPERATION
3109   01/11
Operation Section 4-25
© 2011 Alamo Group Inc.
OPERA
T
ION
Lift and roll back of bucket will increase efficiency
because... 
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE: Do not be concerned if the bucket is not completely filled during each pass. Maximum productivity is
determined by the amount of material loaded in a given period of time. Time is lost if two or more attempts are
made to fill the bucket on each pass.