Sun Microsystems 3900 Series 用户手册

下载
页码 162
Chapter 3
Troubleshooting the Fibre Channel Links
45
For Internal Use Only
5. Rerun
switchtest
.
a. If
switchtest
fails, replace the GBIC and rerun
switchtest
.
b. If the test fails again, replace the switch.
6. If
switchtest
passes, assume that the suspect components are the cable and the
Sun StorEdge T3+ array controller.
a. Replace the cable.
b. Rerun
switchtest
.
7. If the test fails again, replace the Sun StorEdge T3+ array controller.
8. Return the path to production.
9. Return the Sun StorEdge T3+ array LUNs to the correct controllers, if a failover
occured (determine if failovers occur using the
luxadm failover
or
mpdrive
failback
commands).