Fujitsu MBA3147NC 用户手册

下载
页码 138
 
Figure 4.8 shows the max seek current waveform of +5V DC and +12V DC. 
 
MBA3300NC 
MBA3300NP 
MBA3147NC 
MBA3147NP 
MBA3073NC 
MBA3073NP 
Current
 (500m
A
/d
iv) 
Time (10 msec/div) 
Curre
nt
 (500m
A
/di
v)
 
Time (10 msec/div)
C
ur
ren
t (5
00
mA/d
iv
Time (10 msec/div)
+5VDC 
MBA3300NC 
MBA3300NP 
MBA3147NC 
MBA3147NP 
MBA3073NC 
MBA3073NP 
C
urre
nt
 (500mA/
di
v)
 
Time (10 msec/div) 
C
ur
ren
t (5
00
mA/d
iv
Time (10 msec/div)
Current
 (500m
A
/d
iv) 
Time (10 msec/div)
+12VDC 
 
Figure 4.8  Current waveform (Max seek) 
 
(3) 
Power on/off sequence 
a)  The order of the power on/off sequence of +5V DC and +12V DC, supplied to the HDD, does 
not matter. 
 
b)  In a system which uses the terminating resistor power supply signal (TERMPWR) on the 
SCSI bus, the requirements for +5V DC given in Figure 4.9 must be satisfied between the 
HDD and at least one of the SCSI devices supplying power to that signal. 
 
 
 
 
Figure 4.9  Power on/off sequence (1)  
C141-E270 
55