Dacor IF36LNBOL 用户手册

下载
页码 48
15
Installation Instructions
Using a cordless drill, drill a ¼” (6.35 mm) hole in the cold 
5. 
water pipe you have selected.
Fasten the shutoff valve to the cold water pipe with the pipe 
6. 
clamp. Be sure the outlet end is solidly in the ¼” (6.35 mm) 
drilled hole in the water pipe and that the washer is under the 
pipe clamp. Tighten the packing nut. Tighten the pipe clamp 
screws slowly and evenly so washer makes a watertight seal. 
Do not overtighten, or you may crush the copper tubing.
Slip the compression sleeve and compression nut on the 
7. 
copper tubing as shown. Insert the end of the tubing into the 
outlet end squarely as far as it will go. Screw compression nut 
onto outlet end with adjustable wrench. Do not overtighten the 
clamp or the sleeve to prevent crushing of the copper tubing.
IMPORTANT: Before attaching the tubing to shutoff valve, 
flush the main water supply line to remove particles and air in 
the water line. Allow enough flow so that water becomes clear. 
Flushing the water line may help avoid filters and/or water 
valves from becoming clogged.
Turn off the shutoff valve on the water pipe. Coil the copper 
8. 
tubing.
Check for leaks around the saddle valve.
9. 
Connecting to Refrigerator
Unplug the refrigerator or disconnect power.
1. 
Remove the shipping tape from the gray, coiled water tubing 
2. 
on the rear of the refrigerator.
Measure the distance from the shutoff valve to the opening in 
3. 
which the refrigerator will be located. Tubing must be extended 
from the shutoff valve into the refrigerator opening following 
specific guidelines. See Water Supply Requirements.
A ¼” x ¼” (6.35 mm to 6.35 mm) coupling is needed in order 
4. 
to connect the water tubing to an existing household water 
line. Thread the provided nut onto the coupling on the end of 
the copper tubing.
Turn shutoff valve on.
5. 
Check for leaks. Tighten any nuts or connections (including 
6. 
connections at the valve) that leak.
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression nut
E. Compression sleeve
F. Shutoff valve
G. Packing nut
A
B
C
D
E
F
G
A. Water tubing
B. Nut
C. Bulb
D. Coupling (purchased)
E. Ferrule (purchased)
F. Nut (purchased)
G. Household water line (as 
connected in previous section)
A
B
C
D
E F G
Plug in the refrigerator or reconnect power.
7. 
Flush the water system. See 
8. 
Water System Preparation.
NOTE: Allow 24 hours to produce the first batch of ice. Discard 
the first three batches of ice produced. Allow 3 days to completely 
fill ice container.
Plug in Refrigerator
Set control switch at top of cabinet to the off position.
1. 
Plug into a grounded 3 prong outlet.
2. 
Move to Final Location
IMPORTANT: To avoid floor damage, make sure levelers are 
raised (not touching floor) and refrigerator is on rollers before 
moving.
Place top of cardboard carton or plywood under refrigerator. 
1. 
Remove dolly.
Do not remove protective film or cover.
2. 
Move the refrigerator straight back, evenly into the opening. 
3. 
Be sure that the refrigerator side trims are not interfering with 
the door opening. Also, be sure that the water tubing is not 
kinked and the power supply cord is on top of the refrigerator.
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death, 
fire, or electrical shock.
WARNING
WARNING
Tip Over Hazard
Refrigerator is top heavy and tips easily when not 
completely installed. 
Keep doors taped closed until refrigerator is 
completely installed.
Use two or more people to move and install 
refrigerator.
Failure to do so can result in death or serious injury.