3com Version 8.1.2 用户手册

下载
页码 64
Before You Configure ATM
37
Before You 
Configure ATM
Before you configure ATM, follow these steps:
Check the ATM link status.
Verify that address registration is operational.
Verify that signalling is operational. 
Checking
ATM Link Status
To check the link status, follow these steps:
From the top level of the Administration Console, enter:
atm ume display
You are prompted for the number(s) of the UME that you want to display.
Enter the number(s) of the UME(s) or 
all
.
Sample ATM UME display:
The state field should show 
connected
. If the state field shows 
disconnected
, there is a problem with the link. If this happens, check 
the cabling to ensure that the CoreBuilder 2500 system is correctly 
connected to the ATM switch. 
  reqState               state              reqVpi
 connected           connected                   0
       vpi              reqVci                 vci
         0                  16                  16
 connCount           discCount              rxPdus
         2                   2                 232
dropRxPdus              txPdus
         0                 209