Windsor 10066240 用户手册

下载
页码 24
MACHINE OPERATIONS 
86221970  17” SCRUBBER  01/03/07 
3-7 
 
PRE-RUN MACHINE INSPECTION 
Do a pre-run inspection to find possible problems 
that could cause poor performance or lost time from 
breakdown. Follow the same procedure each time to 
avoid missing steps. 
 
NOTE:  See maintenance section for pre-run 
machine inspection checklist items.
 
 
FILLING SOLUTION TANK  
FOR SAFETY: 
Before leaving or servicing 
machine; stop on level surface, turn off machine. 
 
1. 
Turn the machine off. 
 
2. 
Remove solution tank cover. 
 
3. 
Fill the solution tank with clean water, leaving 
enough room for the required amount of 
cleaning solution.  The solution tank capacity is 
8 gallons (30.3 liters).  The water must not be 
hotter than 140
° F (60°C) to prevent damage to 
the tank. 
 
4. 
Measure the chemical into the solution tank.  
Liquid chemicals should be added to the solution 
tank after filling with water.  Dry chemicals 
should be thoroughly mixed before being added 
into the solution tank.  Commercially available, 
high alkaline floor cleaners are suitable for use 
in the solution system. 
 
NOTE:  Read the chemical manufacturers 
recommended proportion instructions.
 
 
5. 
Replace solution tank cover. 
 
 
 
Flammable materials can cause an explosion or 
fire.  Do not use flammable materials in the 
tanks. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NORMAL SCRUBBING  
Plan the scrubbing pattern in advance.  The longest 
track is around the perimeter of the area to be 
cleaned.  For efficient operation, the runs should be 
the longest possible without turning, stopping, or 
raising and lowering scrub brush/squeegee. 
 
NOTE:  In order to achieve the best possible results, 
the area that is to be cleaned should be swept 
before scrubbing.  Large debris, strings & wire must 
be removed to prevent being caught in the brush or 
squeegee.