Enviro 1700 用户手册

下载
页码 48
32
Installation
5.  Mount  the  block-off  plate 
using  masonry  screws  in  a 
masonry  fireplace  and sheet 
metal  screws  on  a  zero-
clearance  fireplace  (screws 
need  only  be  long  enough 
to penetrate the first layer of 
metal).
6.  Insulate  the  block-off  plate 
using 
high-temperature 
fiberglass  insulation  and 
furnace cement.
Masonry Fireplace
Mantel
Damper removed
or fastened open
Surround Panel
USA 16” (406 mm)
CND 18” (450 mm)
Block-off plate or
damper adaptor.
The stainless steel
chimney connector must
extend 12" (305mm) past
the block-off plate.
Mantel
Surround Panel
USA 16” (406 mm)
CND 18” (450 mm)
Block-off plate or
damper adaptor.
Stainless steel chimney
connector must extend
12" (305mm) past the
block-off plate.
Damper must
be removed
Zero-clearance
(metal) firebox
IMPORTANT:
DO NOT modify
any part of the
ZC fireplace
7.  After installing the unit into place and 
the pipe through the block-off plate, 
use  high-temperature  fiberglass 
insulation and furnace cement to seal 
any gaps between the pipe and block-
off plate (allow the cement to dry for 
at least 24 hours before burning).
Before  starting  this  type  of  installation 
refer  to  I
NSTALLATION
  -  M
ASONRY
  F
IREPLACE
 
I
NSTALLATION
  -  I
NSERT
  for  additional 
information.  For  clearances  refer  to 
S
PECIFICATIONS
 - C
LEARANCES
 T
O
 C
OMBUSTIBLES
 - 
1200 I
NSERT
 and S
PECIFICATIONS
 - C
LEARANCES
 
T
O
 C
OMBUSTIBLES
 - 1700 I
NSERT
. See Figure 
38  and  39  for  examples  of  a  masonry 
fireplace  and  a  zero-clearance  fireplace 
with a direct connection 
Figure 38: Insert Install into a Zero-Clearance Fireplace.
Figure 39: Masonry Fireplace Direct Connection Insert Install.