Crown Boiler 24-06 用户手册

下载
页码 90
10
SECTION  I  -  GENERAL INFORMATION (CONTINUED)
A
.   INSPECT  SHIPMENT  carefully  for  any  signs  of 
damage.
1. ALL EQUIPMENT is carefully manufactured, 
inspected and packed.  Our responsibility ceases 
upon delivery of crated boiler to the carrier in good 
condition.
2.  ANY CLAIMS for damage or shortage in shipment 
must be filed immediately against the carrier by the 
consignee.  No claims for variances from, or short-
age in orders, will be allowed by the manufacturer 
unless presented within sixty (60) days after the 
receipt of goods.
3.  Make sure that appropriate items on the Master Parts 
List (pg 59) are all on hand.
B
.   LOCATE THE UNIT
1.  RECOMMENDED SERVICE CLEARANCE 
- Locate the unit in the boiler room so as to 
provide ease of venting and adequate clearance 
for maintenance, serviceability, and installation of 
piping.  Refer to Figure 1 for boiler dimensional 
data.
  FRONT — Provide 43” service clearance for 
removal, maintenance, and servicing of burner and 
controls.  
  REAR — Provide a minimum clearance from the 
boiler jacket for access to flame observation port, 
rear flue damper and vent piping, relief valve, and 
boiler return piping.  See Table III. 
  LEFT SIDE — Provide a minimum clearance from 
the boiler jacket of 26” for cleaning of flueways and 
installation and removal of tankless heater(s).
  RIGHT SIDE — Provide a minimum clearance from 
Table II:  Minimum Clearances To Combustible 
Materials (Inches)
Boilers with Top Flue Outlet 
Boilers with Rear Flue Outlet 
Flue
Outlet
Size
Top
Flue
Outlet
Rear Flue Outlet
Combustible
Surfaces
Non-Combustible
Surfaces
7" Dia.
18"
37"
22"
8" Dia.
38"
23"
10" Dia.
40"
25"
12" Dia.
43"
28"
NOTICE
Recommended clearance for service may be
reduced to minimum clearance to
combustible material.  However, increased
service and maintenance difficulty will
result.
WARNING
Boiler is suitable for installation on
combustible floor.  Do not install boiler
on carpeting.
Floor construction should have
adequate load bearing characteristics
to bear the weight of the boiler filled
with water (see Table 1).  A boiler
foundation similar to the one shown in
Figure 2 is recommended if the boiler
room floor is weak or uneven or if a
water condition exists.
A
e
v
o
b
A
B
t
n
o
r
F
C
r
a
e
R
D
s
e
d
i
S
E
r
o
t
c
e
n
n
o
C
t
n
e
V
6
4
2
6
6
8
1
s
s
e
c
c
a
o
t
e
c
n
a
r
a
e
l
c
e
c
i
v
r
e
s
d
e
d
n
e
m
m
o
c
e
R
r
o
f
II
I
e
l
b
a
T
e
e
S
*
r
e
li
o
b
f
o
r
a
e
r
l
a
n
o
it
a
N
n
a
c
ir
e
m
A
h
ti
w
y
l
p
m
o
c
s
e
c
n
a
r
a
e
l
c
d
e
t
s
i
L
:
1
E
T
O
N
.t
n
e
m
p
i
u
q
e
g
n
i
n
r
u
b
li
o
f
o
n
o
it
a
ll
a
t
s
n
I
,
1
3
A
P
F
N
/I
S
N
A
d
r
a
d
n
a
t
S
h
ti
w
s
m
o
o
r
n
i
d
e
ll
a
t
s
n
i
e
b
n
a
c
s
r
e
li
o
b
4
2
s
e
ir
e
S
:
2
E
T
O
N
d
e
t
s
i
L
.
e
v
o
b
a
d
e
t
s
il
s
a
l
a
ir
e
t
a
m
e
l
b
it
s
u
b
m
o
c
m
o
rf
s
e
c
n
a
r
a
e
l
c
t
e
s
o
l
c
r
o
e
v
o
c
l
a
r
o
f
d
e
c
u
d
e
r
e
b
t
o
n
n
a
c
s
e
c
n
a
r
a
e
l
c
.
s
n
o
it
a
ll
a
t
s
n
i
,l
a
ir
e
t
a
m
e
l
b
it
s
u
b
m
o
c
o
t
s
e
c
n
a
r
a
e
l
c
d
e
c
u
d
e
r
r
o
F
:
3
E
T
O
N
e
v
o
b
a
e
h
t
n
i
d
e
b
ir
c
s
e
d
s
a
d
e
d
i
v
o
r
p
e
b
t
s
u
m
n
o
it
c
e
t
o
r
p
.
d
r
a
d
n
a
t
s
1
3
A
P
F
N
/I
S
N
A
Table III:  Recommended Rear Service Clearance
the boiler jacket of 12”.
  TOP — Provide a minimum clearance from the 
boiler jacket of 24”
2.  FOR MINIMUM CLEARANCES to combustible 
materials, See Table II.
3.  PROVIDE ADEQUATE FOUNDATION for the 
unit.  Refer to Figure 2.