Enterasys csx400 用户指南
![Enterasys](https://files.manualsbrain.com/attachments/0d61cd0d9a60e36f1a6c1364af6a0a9788bcf75b/common/fit/150/50/0c43aa9c6913c8f0c68912f62e6506afc95280a8d9a1fc71e52e7f54646e/brand_logo.jpeg)
Appendix B: WPIM-E1 Configuration
B-12
Local Management User’s Guide
8.
Use the arrow keys to highlight the SAVE command, then press ENTER. The message “Save
Done!” displays and Local Management saves the changes to memory. The host platform
reboots. For further configuration, the Local Management connection must be re-accessed.
Done!” displays and Local Management saves the changes to memory. The host platform
reboots. For further configuration, the Local Management connection must be re-accessed.
WPIM-E1 Interface Configuration
This screen is accessed through the WAN Physical Configuration screen. Proceed with the
following steps to configure the WAN Interface through Local Management.
following steps to configure the WAN Interface through Local Management.
1.
Access the WAN Interface Configuration screen by using the arrow keys to highlight the WAN
Int Config option and then press ENTER.
Int Config option and then press ENTER.
2.
If the correct Interface number to be configured is not displayed, enter it by typing the number
into the Interface Number field or select it using the SPACE bar, then press ENTER (see note
on
into the Interface Number field or select it using the SPACE bar, then press ENTER (see note
on
).
3.
Use the arrow keys to highlight Line Coding. Press the SPACEBAR to select None.
4.
Use the arrow keys to highlight Active Protocol. Press the SPACEBAR to select FR.
5.
Use the arrow keys to highlight FR LMI. Press the SPACEBAR to select Q.933-A.
6.
Use the arrow keys to highlight the SAVE command, then press ENTER. The message “Save
Done!” displays and Local Management saves the changes to memory.
Done!” displays and Local Management saves the changes to memory.
The WAN configuration is complete. Communications between the WPIM-E1 and the service
provider’s switch takes approximately 1-2 minutes to begin. A status of Inactive displays until
both ends of the PVC (Permanent Virtual Circuit) are configured. Once both end devices have
negotiated link management with the switches, the status field reads Active.
provider’s switch takes approximately 1-2 minutes to begin. A status of Inactive displays until
both ends of the PVC (Permanent Virtual Circuit) are configured. Once both end devices have
negotiated link management with the switches, the status field reads Active.
!
CAUTION
If you are using a Local clock source, set only one end of the circuit for Local, the other
end must be set for Loop.
end must be set for Loop.
NOTE
Upon saving this screen, the interface just configured is assigned to an application
port (CKT#) in the table on the right hand side of the screen once the device starts
communicating with the service provider’s switch.
port (CKT#) in the table on the right hand side of the screen once the device starts
communicating with the service provider’s switch.