Champion eucc series 用户指南

下载
页码 241
204
Electric Eye Energy Sentinel System
Electric Eye Bypass Switch—
The electric eye bypass switch is located inside the top
mounted control cabinet to provide manual operation in
the event the Energy Sentinel System experiences a
problem.
 Place the switch in the Automatic position to activate the
Electric Eye system.
—Pumps run when an object enters the load end tunnel.
—Timers control the pump run time and the final rinse.
Place the switch in the Manual position to disconnect the Energy Sentinel System.
—Pumps and final rinse run continuously when the Green start button is pressed.
—Pumps and final rinse shut down when the Red stop button is pressed.
Troubleshooting—
A failure in the electric eyes most often results in the following conditions:
1.
Pumps run constantly.
2.
Pumps will not run at all.
Inspect the components to isolate the defective component:
1.
Make sure that the bypass switch is in the automatic position.
2.
Inspect and clean the lenses of the receiver and the emitter.
3.
Check that electric eyes are aligned.
Check the indicator lights on the back of the electric eyes:
1.
Remove two screws holding electric eye covers. Rotate covers away from tunnel
end so you can see indicator lights inside the covers. Do not remove eyes from covers.
2.
Make sure that the electric eyes are aligned opposite of each other across the belt.
3.
Make sure that both Green LED’s are ON.
4.
Block the beam completely. The Receiver Yellow LED should be OFF.
5.
Unblock the beam completely. The Yellow LED should be ON.
6.
If all LED’s check OK, but the system fails to operate, try replacing the receiver first,
and then the emitter.
Basic Service ________________
 
Electrical Service
Basic Service • Electrical