ATTO Technology Inc. Diamond Storage Array Installation and Operation Manual
 3.2  Physical Set Up
The Diamond Storage Array is shipped completely assembled with two 120 VAC power cords for use in 
the United States and Canada. 
Immediately upon receipt, check the shipping 
carton for damage from mishandling. Contact us 
at once by the means easiest for you (refer to 
carton has been mishandled or displays any signs 
of damage.
Floor model
The Diamond Storage Array is heavy (about 92 
pounds fully loaded) and requires two people to 
lift and carry it safely. Place the array on a level 
surface and make sure there is adequate space in 
the front and back of the unit for proper cooling 
and airflow. Continue with the general 
instructions. 
Rack mount
The array fully loaded is heavy (about 86 pounds). 
The unit should be handled with care and requires 
two people to lift, carry and/or install it safely.
The Diamond Array can be mounted via several 
different methods in a 19” rack with 3U (5.25”) of 
vertical space required. Air flow should not be 
restricted in any way.
Installation in a rack may create a differential 
between the room ambient temperature and the 
internal ambient temperature in the rack. While 
the maximum internal operating temperature of 
the array is 47°C, you should not run the system 
at the maximum temperature for extended 
periods. Therefore, ensure that the room ambient 
temperature is kept below 30°C for best 
operation.
Each side of the rack mount array chassis has 
three pairs of mounting holes. One is located near 
the front of the rack, one near the unit’s center of 
gravity, and one near the rear of the rack. The 
holes will accommodate 10/32 screws but the 
screws can protrude no farther than .375 inches 
into the rack.
Spaced rail pairs in some rackmount cabinets.  
You can mount the array using two sets of rail 
pairs spaced to accommodate the overall length of 
the unit (approximately 23 inches). Mount using 
the rack mount brackets on the front and rear of 
the unit fastened to the rail pairs using 10/32 pan 
head screws with lock and flat washers. 
Rack mount cabinets with stationary shelf or tray 
system. 
The shelf or tray must be able to support 
at least 125 pounds. The shelf or tray must be 
installed and secured to the rack before installing 
the array. Secure the front of the array to the rack 
with 10/32 screws, locks and flat washers. 
Sliding shelf or tray type systems  
should never 
be used under any circumstances. 
Two point open rack system.  
The rack must be 
strong enough to support the Diamond Array 
properly. Mounting brackets should be moved to 
the centermost mounting holes and secured using 
10/32 screws. 
CAUTION
CAUTION
Do not mount multiple arrays on a two-rail 
rack or mount the array above the midpoint 
of a two-rail rack system. Do not mount the 
array on any kind of rail-type system. The 
array is too heavy and does not have the 
proper hole pattern for rails.
Insure the array has adequate air flow and 
continue with the general instructions.