Zhone 6301 安装指导

下载
页码 23
 10
4. Insert the supplied power cord’s round end into the jack labeled POWER. Plug the
transformer into an ac outlet.
POWER
CONSOLE
DSL
2
1
ETHERNET
3
4
99-16585
18 Vdc
800 MA
Transformer
Power
Jack
6342 SDSL Router
The Hotwire 6341/6342 SDSL Router hardware installation is now complete. When the
power cord is installed, the SDSL router goes through a power-on self-test.
Power-On
When power is applied, the Hotwire 6341/6342 SDSL Router performs self-diagnostics
and the PWR LED is on. The self-diagnostics includes a power-on self-test. During the
power-on self-test, all of the LEDs turn on for one second.
TST
DSL
ETHERNET
ALM
PWR
TM
00-16503-01
Power – green
Alarm – red
Test – yellow
Digital Subscriber Line – green
Ethernet Link 1 to 4 – green
6342
1
2
3
4
Refer to Troubleshooting on page 12 for LED indications requiring action.