Zhone 6301 安装指导

下载
页码 20
7
4. Insert the supplied power cord’s round end into the jack labeled POWER. Plug the 
transformer into an AC outlet.
Installation of the hardware is now complete. When the power cord is installed, the 
router goes through a power-on self-test.
Power-On
When power is applied, the router performs self-diagnostics and the PWR LED is on. 
The self-diagnostics include a power-on self-test. During the power-on self-test, all of 
the LEDs turn on for one second. 
Refer to 
 on page 8 for information about the LEDs. Refer to 
 on page 9 for LED indications requiring action.
POWER
CONSOLE
DSL
ETHERNET
01-16931
or
18 VDC
800 MA
Transformer
Power
Jack
6351 ReachDSL Router
01-16932
Hotwire 6351
ReachDSL
Router
TST
LINE
ETHERNET
ALM
PWR
Power – green
Alarm – red
Test – yellow
Transmit/Receive – green
Ethernet Link – green
TX/RX
DSL Line – green
ReachDSL
6351
R
R