Newco gxf-8d 操作指南

下载
页码 7
PLUMBER'S INSTALLATION INSTRUCTIONS (AUTOMATIC BREWERS) 
CAUTION:
 Power to brewer must be OFF before proceeding with plumbing installation. 
 
1)  Attach strainer assembly to back of brewer if desired. Note: Faucet units will have a mini arrestor installed on the 
 
back of the brewer to which strainer should be attached. Strainer inlet will point down. 
 
2)  Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best operation. 
 
3)  Water pressure should be at least 20 lbs. For less than a 25 ft run, use 1/4" copper tubing and connect to 1/2" or 
 
larger water line. For longer runs, use 3/8" copper tubing & connect to 1/2" or larger water line and provide an 
 
adapter fitting for connection to the brewer. 
 
4)  If installed with saddle valve, the valve should have a minimum of 1/8" port hole for up to 25 ft run, and 5/16" port 
 
hole for over 25 ft runs. 
 
5)  Connect incoming water line to the strainer on the back of the brewer. Manufacturer recommends connecting to 
 copper 
tubing. 
 
ELECTRICAL HOOKUP 
FILL BREWER TANK WITH WATER BEFORE CONNECTING TO POWER SUPPLY ! 
 
WARNING:
 - Read and follow installation instructions before plugging or wiring in machine to electrical circuit. 
Warranty will be void if machine is connected to any voltage other than that specified on the name plate. 
 
 
This brewer is Voltage Convertible and may be hooked up to either a 120V ac or 240V ac single phase circuit. The 
pictorial view on the next page illustrates the power cord connection to the terminal block for both circuits. A wiring 
diagram on the rear of this manual illustrates the complete brewer wiring. Kits required for converting between the 
voltages, along with an assembly illustration, are shown on the next page. 
 
 
Note that on 240 V circuits the tank heater system is the only portion of the brewer running on 240V. The balance of 
components are powered by 120V obtained by tapping one leg, L1, of the circuit. Refer to the wiring diagram on the 
back page for hookup of other internal wiring in brewer. Note that the position of the orange wire with the white stripe is 
the only change to internal wiring between 120V and 240V hookup. The orange wire with white stripe should be 
positioned on the Neutral terminal of the terminal block for 120 V operation and L2 for 240 V operation. 
 
To attach power cord or conduit: 
 
1)  Remove the front access panel covering component area by removing the four retaining screws. 
 
Locate the cord plate (Pg 3, Item A) on rear of unit and remove the two screws retaining it. Remove the cord plate. 
 
3)  Note the cord plate serves multiple functions as a cord plate, heat shield and as a feed through device to assist in  
feeding the cord from the rear of brewer to the front component area. Note that 120V units will have an adaptor plate 
also (Pg 3, Item 3). 
 
 
For 120V units remove the cable connector (Pg 3 Item 7) if present. Insert the power cord and plate assembly (Pg  3,              
Item 4) through the cord plate/shield (Pg 3, Item A) and through the bushing (Pg 3, Item B) at the other end of 
shield. 
 
 
For 240 V units remove the power cord and plate assembly if present (Pg 3, Item 4). Attach cable connector/strain 
 
relief (Pg 3, Item 8) to the cord plate/shield if not already present. Insert appropriate power cord/conduit through 
 
the cord plate/shield. Feed wire leads through bushing at other end of shield. 
 
4)  Using the cord plate/shield, guide cord through terminal block access hole and reattach cord plate, and adapter 
plate on 120 V models, to the brewer.