Extreme 3802 安装指南

下载
页码 394
 
118
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing and Connecting Summit Power Supplies
Installing or Removing an External Power Supply 45019 
(EPS-LD)
The Extreme Networks External Power Supply 45019 (EPS-LD) provides additional power to switches 
that support Power over Ethernet (PoE), such as the Summit 300-24 and Summit 400-24p. The EPS-LD 
provides 465 W total power with 375 W dedicated for PoE applications. When attached to the Summit 
300-24 or Summit 400-24p, the EPS-LD acts as a redundant power supply. The wattage is sufficient to 
power all ports on the Summit 300-24 and Summit 400-24p models.
The external power supply box contains the following items:
One EPS-LD unit
Mounting hardware, including screws
One AC power cable for use in North America. 
One EPS-LD cable (1 meter long) for connecting the power supply to the switch.
NOTE
If you are using the EPS-LD outside North America, the input power cord must have an IEC320-C14 
connector and the appropriate power input plug for the country in which you are operating. The cord 
must be 10 feet or less and at least 16-gauge copper wire.
CAUTION
Only trained service personnel should install or remove the Extreme EPS-LD unit, in accordance with 
the installation instructions. Before servicing this system, please read the safety information provided in 
Appendix A.
 Not following these precautions can result in equipment damage or shock.
The EPS-LD unit can be mounted in a rack or placed free-standing on a tabletop. You can mount the 
EPS-LD facing either the front or the back of the rack. For this reason, each unit has two sets of 
mounting holes, two on each end. Mount the EPS-LD so that the unit’s output connectors are on the 
same side as the external connector on the connecting switch.
CAUTION
Do not use the rack-mount kits to suspend the EPS-LD from under a table or desk, or to attach the 
switch to a wall.
Rack-mounting the EPS-LD unit
NOTE
When installing an EPS-LD in a rack, make sure air vents are not restricted. Allow for elevated ambient 
operating temperatures when the EPS-LD is installed adjacent to other equipment. Be sure you mount 
the equipment within the rack so that the load is evenly distributed.
To install the EPS-LD, you need the following tools and materials:
Electrostatic strap
#1 Phillips screwdriver