LG LD15X740P2B 业主指南

下载
页码 16
- 9 -
Drill and prepare the ceiling so that it can 
accommodate  the product (refer to page 8 for 
product size).
1
Connect the 3 product cables to the interior 
wiring of the building. For finishing cap, use 
standardized products.
Connect the 3 product cables to the interior 
wiring of the building. For finishing cap, use 
standardized products.
2
3
Installation
Product Configuration and Information, Size
Make sure to turn off the main power switch off the installation space 
before connection.
Connect so that the colors of the 3 power cables match. 
(LIVE: BROWN, NEUTRAL: BLUE, P.E.: GREEN/YELLOW)
Product’s power cables
Interior wiring of the building
NEUTRAL
LIVE
P.E.
[Completed installation]
WARNING
 MFL67082801,REV06,��.indd   9
11. 7. 12.   �� 11:16