D-Link DAS-3224_revC 产品宣传页

下载
页码 44
Preparing for Installation 
19 
Verifying Contents 
To verify that your shipment is complete, make sure that you received everything on your packing list, 
and then compare your packing list to your order. If any items are missing or you need additional 
information, contact your local supporter. 
 
Inspecting for Damage 
After you verify that all of the equipment is included, carefully examine the assemblies, units and 
cables for any damage resulting from shipping. If you suspect any damage form shipping, contact your 
local freight carrier for procedures on damage claims. 
 
If you observe any physical defects in the items you ordered, obtain standard warranty service by 
delivering the defective part to your local supporter during the applicable warranty period. 
 
 
DAS3 Series IP-DSLAM 
System Installation Guide