Cisco Cisco UCS B440 M1 High-Performance Blade Server 信息指南

下载
页码 3
 
 
Product End-of-Life Notice
 
© 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. 
Page 1 of 3 
End-of-Sale and End-of-Life Announcement for the 
Cisco 16GB DDR3-1333MHz RDIMM/PC3-
10600/2R/Low-Dual Voltage Memory 
EOL8322 
Cisco announces the end-of-sale and end-of life dates for the Cisco 16GB DDR3-
1333MHz RDIMM/PC3-10600/2R/Low-Dual Voltage Memory. The last day to order 
the affected product(s) is September 14, 2012. Customers with active service 
contracts will continue to receive support from the Cisco Technical Assistance Center 
(TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life 
milestones, definitions, and dates for the affected product(s). Table 2 lists the product 
part numbers affected by this announcement. For customers with active and paid 
service and support contracts, support will be available until the termination date of 
the contract, even if this date exceeds the Last Date of Support shown in Table 1. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco 16GB DDR3-1333MHz RDIMM/PC3-10600/2R/Low-Dual 
Voltage Memory 
Milestone 
Definition 
Date 
End-of-Life 
Announcement Date 
The date the document that announces the end of sale and end of life of a product is 
distributed to the general public. 
June 15, 2012 
End-of-Sale Date  
The last date to order the product through Cisco point-of-sale mechanisms. The product is no 
longer for sale after this date. 
September 14, 2012 
Last Ship Date: 
HW 
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. 
Actual ship date is dependent on lead time. 
December 13, 2012 
End of Routine Failure 
Analysis Date:  
HW 
The last-possible date a routine failure analysis may be performed to determine the cause of 
hardware product failure or defect. 
September 14, 2013 
End of New Service 
Attachment Date: 
HW 
For equipment and software that is not covered by a service-and-support contract, this is the 
last date to order a new service-and-support contract or add the equipment and/or software 
to an existing service-and-support contract. 
September 14, 2013 
End of Service Contract 
Renewal Date: 
HW 
The last date to extend or renew a service contract for the product.  
December 10, 2016 
Last Date of Support: 
HW 
The last date to receive service and support for the product. After this date, all support 
services for the product are unavailable, and the product becomes obsolete. 
September 30, 2017 
 
HW = Hardware 
OS SW = Operating System Software  App. SW = Application Software