Cisco Cisco IPICS Release 4.5 数据表

下载
页码 2
 
 
Data Sheet 
© 2013 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. 
Page 1 of 1 
IPICS P25 Technology Migration, Test, and 
Remote Management Service 
 
The Cisco
®
 IP Interoperability and Collaboration System (IPICS) provides a systems approach to communications 
interoperability, operations, and emergency management that delivers the right information to the right person in 
the right format at the right time. With the newest release of IPICS, the Inter Subsystem Interface (ISSI) and Digital 
Fixed Station Interface (DFSI) gateway provides the capability to have a standardized network interfaces to a P25 
radio system.  
Because many P25 customers use multivendor solutions to save costs while streamlining operations, vendors 
must be able to meet P25 specifications. Cisco provides IPICS P25 planning and testing support to help vendors 
take full advantage of these new IPICS capabilities and ensure that their other integrated systems are compliant 
with P25 standards. The Cisco Adanved Services complements partner services by providing Cisco IPICS subject 
matter experts to assure P25 ISSI, DFSI, and CSSI requirements are captured and tested.  
Cisco’s P25 Technology Migration services can also help customers economically upgrade and migrate their 
existing radio systems infrastructure to P25, fully open standards compliant systems. This is attractive for many 
customers who may have existing radio systems from equipment providers that are not yet fully compliant P25 
systems. Customers benefit from significant savings avoiding expensive maintenance fees from proprietary 
vendors. Beyond P25, Cisco can advise Public Safety customers on how to upgrade to private LTE networks. 
Ultimately ensuring that mission critical IP infrastructures can properly handle voice, video, and data.  
Key activities: 
 
Advise customers on how to migrate, to fully compliant P25 systems  
 
Discovery session identifying technical integration and network readiness requirements 
 
Development of a customer-specific integration test plan 
 
Knowledge transfer sessions covering P25 integration test plan, test results, and recommendations based 
on those results 
 
Design mission critical LTE networks  
 
Advise on how to manage and support the network after installation