Cisco Cisco IP Solution Center 6.0 信息指南
Product End-of-Life Notice
© 2008 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information.
Page 1 of 3
End-of-Sale and End-of-Life Announcement for the Cisco
IP Solution Center MPLS VPN Management - Selected 4.2
Licenses
IP Solution Center MPLS VPN Management - Selected 4.2
Licenses
EOL6508
Cisco
®
announces the end-of-sale and end-of life dates for the Cisco IP Solution Center
MPLS VPN Management - Selected 4.2 Licenses. The last day to order the affected
product(s) is January 29, 2009. Customers with active service contracts will continue to
receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1
of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for
the affected product(s). Table 2 lists the product part numbers affected by this
announcement. For customers with active and paid service and support contracts,
support will be available until the termination date of the contract, even if this date
exceeds the Last Date of Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco IP Solution Center MPLS VPN Management -
Selected 4.2 Licenses
Selected 4.2 Licenses
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a
product is distributed to the general public.
product is distributed to the general public.
July 31, 2008
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms.
The product is no longer for sale after this date.
The product is no longer for sale after this date.
January 29, 2009
Last Ship Date:
App. SW
App. SW
The last-possible ship date that can be requested of Cisco and/or its
contract manufacturers. Actual ship date is dependent on lead time.
contract manufacturers. Actual ship date is dependent on lead time.
April 29, 2009
End of SW Maintenance
Releases Date:
App. SW
Releases Date:
App. SW
The last date that Cisco Engineering may release any final software
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
January 29, 2010
End of New Service
Attachment Date:
App. SW
Attachment Date:
App. SW
For equipment and software that is not covered by a service-and-support
contract, this is the last date to order a new service-and-support contract or
add the equipment and/or software to an existing service-and-support
contract.
contract, this is the last date to order a new service-and-support contract or
add the equipment and/or software to an existing service-and-support
contract.
January 29, 2010
End of Service Contract
Renewal Date:
App. SW
Renewal Date:
App. SW
The last date to extend or renew a service contract for the product.
April 27, 2011
Last Date of Support:
App. SW
App. SW
The last date to receive service and support for the product. After this date,
all support services for the product are unavailable, and the product
becomes obsolete.
all support services for the product are unavailable, and the product
becomes obsolete.
January 29, 2012
HW = Hardware
OS SW = Operating System Software
App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part
Number
Number
Product Description
Replacement Product
Part Number
Part Number
Replacement Product Description
ENTRY-ISC4.2-K9
ISC 4.2 MPLS Prov and L2
Eth Access Bundle -incl
200 AL, QoS
Eth Access Bundle -incl
200 AL, QoS
BASE-ISC5.0-K9
ISC 5.0 CD Base Media (Required For All
New Customers)
New Customers)
ENTRY-ISC4.2-K9
ISC 4.2 MPLS Prov and L2
Eth Access Bundle -incl
200 AL, QoS
Eth Access Bundle -incl
200 AL, QoS
MPLS-ISC5.0-AP
ISC 5.0 MPLS Provisioning (Incl Ethernet
Access) -Incl 200 A
Access) -Incl 200 A