Cisco DNCS System Release 2.7 3.7 4.2 安装指南

下载
页码 152
 
Appendix F 
Download LED Indicators 
120 
78-4003052-01 Rev G 
LED Indicators Displayed During an OSM 
Download 
Understanding the LED Indicator Sequence in OSM Downloads 
After a DHCT is connected to the RF network and AC power is applied, the 
Bootloader monitors the download, verification, and installation of the new OS into 
memory. At the end of the process (which might repeat until the DHCT receives a 
valid OS download), the DHCT displays one of the following: 
 
The Service Disconnect mode (brick mode) indicator (if enabled on your system) 
 
The clock 
The following table shows an example of an OSM download sequence of front panel 
LED displays that appear after AC power is applied to the DHCT. 
Note: The front-panel alphanumeric LED displays that appear on the Explorer 
DHCTs may change for each stage of the DHCT software download process. 
Therefore, in the following table, the LED displays that correspond to certain stages 
of the download process may be repeated or skipped, as noted in the Description 
column. In other words, the stages do not always occur in the order shown. 
Stage  Alphanumeric 
LED Indicator 
TV Monitor 
Description 
1. 
 
 
The “wave” appears each time the DHCT 
resets. The DHCT is initializing and testing 
the system. The wave provides a visual cue 
as to when to press buttons to force 
auxiliary functions. 
2. 
 
 
The DHCT boots into the OS. 
3. 
 
 
“Dancing dashes” that alternate between 
the middle [ - - ] and outside [-   -] 
segments appear when the OS runs the 
Guardian Mode application to receive the 
upgrade. The image installs from the BFS 
into internal DRAM.