Cisco Cisco OptoStar II Driver Amplifier 安装指南

下载
页码 75
Starting the Power Supply 
Initialization 
When the OptoStar II power supply module is powered on, the module will 
perform a self-test. 
Follow these steps to perform the self-test: 
1.  Turn the front panel switch of the OptoStar II power supply module to ON 
position. 
2.  When the power supply module starts up, it will perform a booting 
initialization for about 5 seconds. 
3.  During the initialization, the power LED and the alarm LED on the front 
panel will be illuminated, and the communication status is shut off. 
4.  Once the initialization is completed, the status indicator will return to normal. 
Communication is enabled and the module is operational. 
CAUTION:   
• 
The module must be initialized; any equipment that cannot be initialized must 
be returned to the manufacturer for repair. 
• 
When the module becomes stable, it still needs to warm up for at least one hour, 
to make sure that the normal performance is achieved. 
Signal Inspection 
• 
Use a digital voltmeter to test the voltage of the DC test point, the specification 
is 24 ± 0. 5 V.   
 
 
 
 
 
OL-29659-03 
Operation 
3-5