Cisco Laser Link Ancillary Modules 安装指南
78-4028521-01 Rev B
Installation
2-3
Laser Link III Mainframe Installation,
Continued
Circuit Overloading
When connecting the equipment to the supply circuit be aware of the effect that
When connecting the equipment to the supply circuit be aware of the effect that
overloading of circuits could have on overcurrent protection and supply wiring.
Consideration of equipment nameplate ratings should be used when addressing this
concern.
Reliable Grounding
Reliable grounding of rack-mounted equipment should be maintained. Particular
Reliable Grounding
Reliable grounding of rack-mounted equipment should be maintained. Particular
attention should be given to supply connections other than direct connections to the
branch (e.g. use of power strips).
Tools and Equipment
The following tools and equipment are required for installation.
•
•
#2 Phillips-head screwdriver
Procedure
Follow this procedure to install the Laser Link III Mainframe.
1.
Position the mainframe in the desired location, using two people to support it
until it can be secured with hardware.
Note: The Laser Link III Mainframe is intended for installation and operation
Note: The Laser Link III Mainframe is intended for installation and operation
in a restricted access area.
2.
Secure the mainframe into position from the front using four standard rack
screws.