Installation 
2-3 
Laser Link III Mainframe Installation,
 Continued 
Circuit Overloading 
When connecting the equipment to the supply circuit be aware of the effect that 
overloading of circuits could have on overcurrent protection and supply wiring.  
Consideration of equipment nameplate ratings should be used when addressing this 
concern. 
Reliable Grounding 
Reliable grounding of rack-mounted equipment should be maintained.  Particular 
attention should be given to supply connections other than direct connections to the 
branch (e.g. use of power strips). 
Tools and Equipment 
The following tools and equipment are required for installation. 
• 
#2 Phillips-head screwdriver 
Procedure 
Follow this procedure to install the Laser Link III Mainframe. 
 
1. 
Position the mainframe in the desired location, using two people to support it 
until it can be secured with hardware. 
Note:  The Laser Link III Mainframe is intended for installation and operation 
in a restricted access area. 
2. 
Secure the mainframe into position from the front using four standard rack 
screws.