Cisco Laser Link Proteus Scaleable Node 安装指南

下载
页码 53
2-6 
Installation 
78-4028521-01 Rev B 
Laser Link III Mainframe Electrical Connections,
 Continued 
Power Distribution Board 
The power distribution board routes status and powering signals to and from the 
housed modules.  The illustration below is a general location view of the power 
distribution board.