HP ProLiant DL360 用户手册

下载
页码 43
Power Cords
NOTE: The Compaq ProLiant DL360 G2 ships with an IEC-IEC power cord used
for rack mounting with Power Distribution Units (PDUs). For stand-alone
deployments or installation without a rack, country-specific power cord options
are available. U.S. & Japan models will ship with two power cords: IEC-IEC
(142257-002) and North American C13-Nema 5-15P (103541-001) cords.
 
Power Cord, Euro, 10A 250 V Straight (12 ft/3.7 m)
157215-021
Power Cord, UK, 10A 250 V Straight (12 ft/3.7 m)
157216-031
Power Cord, Danish, 10A 250 V Straight (12 ft/3.7 m)
157218-081
Power Cord, Swiss, 10A 250 V Straight (12 ft/3.7 m)
157219-111
Power Cord, Italian, 10A 250 V Straight (12 ft/3.7 m)
157217-061
Power Cord, South Africa, 10A 250 V Straight (12 ft/3.7 m)
157220-AR1
Service and Support
Offerings
(HP Care Pack
Services)
Hardware Services 4-Hour On-site Service
 
5 x 9 Coverage, 3 Years (6-3 Part Number for U.S.)
162676-002
5 x 9 Coverage, 3 Years (6-3 Part Number for Canada)
162676-122
5 x 9 Coverage, 3 Years (6-3 Part Number for EMEA)
324416-002
7 x 24 Coverage, 3 Years (6-3 Part Number for U.S.)
162675-002
7 x 24 Coverage, 3 Years (6-3 Part Number for Canada)
162675-122
7 x 24 Coverage, 3 Years (6-3 Part Number for EMEA)
376910-022
Installation & Start-up Services
 
Hardware Installation (6-3 Part Number for U.S.)
401791-002
Hardware Installation (6-3 Part Number for Canada)
401791-122
Hardware Installation (6-3 Part Number for EMEA)
Quote
Server Installation and Set-Up (Installation of the server, installation of the
appropriate service tools, check to ensure device SW and firmware is loaded
and installation of the operating system software (6-3 Part Number for EMEA)
204563-022
Pre-installation planning; unpack equipment, install most current Compaq HW
options internal to server at same time of server installation; assemble & test;
basic user information provided; Install & configure basic functionality of Win NT
Operating System plus up to 1 day start-up activity, configure print & network
access services, and orientation (6-3 Part Number for U.S.)
240013-002
Pre-installation planning; unpack equipment, install most current Compaq HW
options internal to server at same time of server installation; assemble & test;
basic user information provided; Install & configure basic functionality of Novell
NetWare Operating System plus up to 1 day start-up activity, configure print &
network access services, and orientation (6-3 Part Number for U.S.)
240008-002
HP Care Pack Priority Services for ProLiant Servers – Priority Level
 
9 x 5 HW, 4-hr response, Next Available HW engineer; 9 x 5 Bronze Software
Support 2-hr response for Windows NT, Windows 2000, Professional, Server or
Advanced Server Operating System, Next Available Specialist (6-3 Part Number
for U.S.)
239928-002
9 x 5 HW, 4-hr response, Next Available HW engineer; 9 x 5 Bronze Software
Support 2-hr response for Novell NetWare Operating System, Next Available
Specialist (6-3 Part Number for U.S.)
239968-002
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (2-5-2 Part
Number for Canada)
FP-CZ101-36
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (2-5-2 Part
Number for Canada)
FP-CZ101-36
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (6-3 Part
Number for Canada)
155323-122
QuickSpecs
Compaq ProLiant DL360 Generation 2
Options
DA - 11049   Worldwide QuickSpecs — Version 35 — 9.30.2003
Page 32