Toshiba 1000 用户手册

下载
页码 64
 
 
 
XVIII 
Inspection/Storage/Disposal 
 
 
 
Inspection 
Upon receipt of the UPS, an inspection for shipping damage should be performed. Use 
caution when removing the unit from the pallet. Refer to labels or documentation 
attached to packing material. 
Uncrating 
Check the unit for loose, broken, bent or otherwise damaged parts. If damage has 
occurred during shipping, keep all original crating and packing materials for return to 
the shipping agent. The warranty does not apply to damage incurred during shipping. 
Ensure that the rated capacity and the model number specified on the nameplate 
conform to the order specifications. 
Storage 
During periods of non-use, the following guidelines are recommended for storage. 
Storage Preparation 
1.  Power up the UPS and allow it to operate with no load for 24 hours to fully charge 
the batteries. 
2.  Stop the unit. 
3.  Disable the COLD START function  prior to storing the unit by following the 
instructions in section 4. Shipping, page 6. 
4.  Ensure the MCCB switch is in the Off position. 
Storing Conditions 
•  For best results, store the UPS in the original shipping container and place on a 
wood or metal pallet. 
•  Storage temperature — -4 – 104 °F (-20 – 40 °C). 
CAUTION