temco-tool 39rdvdsn 用户手册

下载
页码 44
9
RDVDSN Series Direct Vent Gas Fireplace
20007894
Your fireplace is approved to be vented either through 
the side wall, or vertical through the roof.
•  Only CFM Corporation venting components spe-
cifically approved and labelled for this fireplace 
may be used.
•  Venting terminals shall not be recessed into a wall or 
siding.
•  Horizontal venting which incorporates the twist lock 
pipe must be installed on a level plane without an 
inclining or declining slope.
• 
Horizontal venting which incorporates the use of flex 
venting shall have an inclining slope from the unit of 
1” (25 mm) per 24” (610 mm).
General Venting
There must not be any obstruction such as bushes, 
garden sheds, fences, decks or utility buildings within 
24” from the front of the termination hood.
Do not locate termination hood where excessive snow 
or ice build up may occur. Be sure to check vent termi-
nation area after snow falls, and clear to prevent ac-
cidental blockage of venting system. When using snow 
blowers, make sure snow is not directed towards vent 
termination area.
Location of Vent Termination 
It is imperative the vent termination be located observ-
ing the minimum clearances as shown on the following 
page.
The EB-1 Electrical junction box has been fitted stand-
ard on this model to allow for the easy connection of an 
optional fan kit. 
To connect the EB-1 box to the house electrical supply 
follow the steps below.
1.  Unscrew retaining screw from EB-1 base plate  (Fig. 
8) and remove the EB-1 assembly from the appli-
ance. 
2.  Remove the front cover of the EB box.
3.  Remove the plug socket assembly from the EB-1 
box.
4.  Feed the supply line in through the EB-1 opening in 
the side of the appliance and then through the back 
of the EB-1 assembly. (Fig. 6)
5.  Connect the black wire of the power supply line to 
the brass screw (polarized) of the socket assembly.
6.  Connect the white wire of the power line to the 
chrome screw of the socket assembly.
7.  Connect the ground wire of the supply line to the 
green screw of the socket assembly.
FP580
INSTA VENT FREE
EB1 JUNCTION BOX
11/18/97
OUTSIDE
FRONT OF UNIT
INSIDE
FRONT OF
 UNIT
Electrical Box
Retaining Screw
FP580
Fig. 6   EB-1 receptacle.
8.  Refit the socket assembly back into the electrical 
box and replace the cover plate. Secure the cable 
with the clamp on the outside of the EB-1 base 
plate and refit the EB-1 assembly to the unit with the 
screw removed in step 1.